§60.2942 - What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable?
Title 40 | STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES
part_subject: "STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES (CONTINUED)"
subpart_code: "E"
subpart_subject: "EEE—Standards of Performance for Other Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which Modification or Reconstruction is Commenced on or After June 16, 2006"
section_number: "60.2942"
section_subject: "What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable?"
cfr_reference: "40 CFR 60.2942"
title_name: "Title 40"
title_subject: "Protection of Environment"
parts_covered: "Part 60 (§ 60.500 to end of part 60 sections)"
revised_date: "Revised as of July 1, 2019"
publication_date: "As of July 1, 2019"
contains_description: "Containing a codification of documents of general applicability and future effect"
publication_info: "Published by the Office of the Federal Register National Archives and Records Administration as a Special Edition of the Federal Register"
---
(a)Where continuous emission monitoring systems are required, obtain 1-hour arithmetic averages. Make sure the averages for carbon monoxide are in parts per million by dry volume at 7 percent oxygen. Use the 1-hour averages of oxygen data from your continuous emission monitoring system to determine the actual oxygen level and to calculate emissions at 7 percent oxygen.
(b)Obtain at least two data points per hour in order to calculate a valid 1-hour arithmetic average. Section 60.13(e)(2) requires your continuous emission monitoring systems to complete at least one cycle of operation (sampling, analyzing, and data recording) for each 15-minute period.
(c)Obtain valid 1-hour averages for at least 75 percent of the operating hours per day for at least 90 percent of the operating days per calendar quarter. An operating day is any day the unit combusts any municipal or institutional solid waste.
(d)If you do not obtain the minimum data required in paragraphs (a) through (c) of this section, you have deviated from the data collection requirement regardless of the emission level monitored.
(e)If you do not obtain the minimum data required in paragraphs (a) through (c) of this section, you must still use all valid data from the continuous emission monitoring systems in calculating emission concentrations.
(f)If continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements, refer to table 3 of this subpart. It shows alternate methods for collecting data when systems malfunction or when repairs, calibration checks, or zero and span checks keep you from collecting the minimum amount of data.